Home Dulverton Primary School
Dulverton Primary School
VALUE:
£36,082.75
TIMESCALE:
4-weeks
“A delightful renovation project at Dulverton Primary School, transforming restroom spaces with new cubicles, fixtures, and aesthetic enhancements to create a refreshed, functional environment for students and staff.”
Client
Value
4-weeks
Type of Contract
Consultant
Scope of Works
Supply and install new cubicles, Supply and install half height back IPS panels, Supply and install new vanity units to accommodate basins, Supply and install toilets with concealed cisterns and seats, Supply and install basin and taps with associated plumbing, Decorations to remainder of room.
Challenges
- All works to be carried out within the summer holidays, evenings and weekends.
- Specific doors needed matching aesthetically to original door styles in keeping with the age of the building.
- Floor levels varied due to a previously external space now being an internal corridor.
- School had an existing suiting system in place for keys.
Solutions
- Pre planning all works making sure full design was approved and the relevant materials ordered and on site and ready to install.
- Carried out a full design in advance and worked with specialist suppliers to ensure we could match the original doors and achieve the FD30s rating.
- Discussed solutions with the door manufactures and installed drop seals to all corridor doors where needed.
- Engaged the schools original locksmith to match the suiting system for the keys.
Why This Case Study
- Successful project with many challenges to overcome whilst being conscientious of the schools needs.
- Our works took place over the easter holiday period, with a typically six week project being achieved within the two week easter break.
- We left the school happy with minimum disruption to the building, returning the site clean and tidy, ready for students to return straight back.
You may also like
VALUE: £450,000 TIMESCALE: 6-weeks “The project at Bromley Primary School involved
VALUE: £925,000 TIMESCALE: 40-weeks “The project involved the careful restoration and
VALUE: £35,082.75 TIMESCALE: 2-weeks “At Belvedere Infant School, we completed a