Belverdere Infant School
VALUE:
£35,082.75
TIMESCALE:
2-weeks
“At Belvedere Infant School, we completed a swift and seamless upgrade of staff toilets over the Easter break, ensuring a refreshed and hygienic space ready for everyone’s return.”
Client
Value
2-weeks
Type of Contract
Consultant
Scope of Works
Strip out and clear from site existing toilet cubicles wash hand basins and cubicles. Strip out and clear from site existing vinyl flooring. Strip out ceiling tiles and clear from site, grid to remain. Hack off tiling and clear from site. Supply and lay new non-slip safety vinyl, from the Polysafe standard PUR range. Supply and install new hygienic ceiling tiles, from the British gypsum Gyprex Satinpar ceiling tiles.
Challenges
- All works to be carried out within the easter holidays, evenings and weekends.
- Specific doors needed matching aesthetically to original door styles in keeping with the age of the building.
- Floor levels varied due to a previously external space now being an internal corridor.
- School had an existing suiting system in place for keys.
Solutions
- Pre planning all works making sure full design was approved and the relevant materials ordered and on site and ready to install.
- Carried out a full design in advance and worked with specialist suppliers to ensure we could match the original doors and achieve the FD30s rating.
- Discussed solutions with the door manufactures and installed drop seals to all corridor doors where needed.
- Engaged the schools original locksmith to match the suiting system for the keys.
Why This Case Study
- Successful project with many challenges to overcome whilst being conscientious of the schools needs.
- Our works took place over the easter holiday period, with a typically six week project being achieved within the two week easter break.
- We left the school happy with minimum disruption to the building, returning the site clean and tidy, ready for students to return straight back.
You may also like
VALUE: £450,000 TIMESCALE: 6-weeks “The project at Bromley Primary School involved
VALUE: £925,000 TIMESCALE: 40-weeks “The project involved the careful restoration and
VALUE: £36,082.75 TIMESCALE: 4-weeks “A delightful renovation project at Dulverton Primary