Spire Hospital Portsmouth - Theatre 4

Full redesign of current storage area to make a new theatre space which included new UPS, IPS, theatre control panel (Brandon Medical), PACS viewer (Brandon Medical), medical theatre light (Brandon Medical), medical cable flow trunking, earth bonding bar, nurse call, data, fire alarm, and fully rewired including new distribution boards.

Works completed

Full re design of current storage area to make a new theatre space which included

The Challenge

Converting an existing storage area into a fully compliant operating theatre required a complete electrical redesign, which was delivered within a live hospital environment. The project demanded precision, coordination, and strict adherence to clinical standards.

One of the main challenges involved installing the new Brandon Medical theatre light. The ceiling void above the operating space was exceptionally high, meaning a standard fixing point could not be used. A bespoke frame had to be engineered to ensure absolute rigidity and stability. Another significant challenge was the installation of the IPS panel within a clean corridor serving another active theatre. This required a full shutdown of the area, demanding meticulous planning to complete installation and commissioning within a limited timeframe. In addition, managing multiple specialist contractors and hospital teams under a tight programme required constant coordination and control to ensure work progressed without disruption to hospital operations.

Our Solution

Our team approached the project with detailed planning and disciplined execution. A custom-engineered uni-strut box frame was fabricated and installed within the ceiling void to provide a stable and secure mounting for the surgical light, achieving complete structural integrity.

The IPS installation and commissioning were carried out during a tightly scheduled shutdown, coordinated with Brandon Medical and the hospital’s maintenance team. By aligning all trades, maintaining clear communication and preparing every material in advance, we ensured all electrical systems—including UPS, theatre control, lighting, and fire alarm—were installed, tested, and handed over smoothly.

Challenge 2

The second challenge we faced was locating the ips panel. The ips panel was sited within a storage cupboard in the clean corridor which served another theatre, we had to arrange a full shut down of this area in order to instal the ips , which meant meticulous planning for the short window we had to do the works.

We needed to get the right number of engineers on site including combining this with the specialist contractor ( Brandon Medical ) to do there commissioning in the same shut down , as we had a deep clean booked at the end of the weeks shut down, we had all materials accounted for and allowed for all eventualities. 

In the end it went to plan, deep clean was done and clean corridor was available to the theatre team on the Monday as planned. 

Challenge 3

One of the biggest challenges we faced in the theatre was bringing all contractor together to complete the works on time, with constraints on program and the complexity of having both our own specialist contractors and hospital teams this meant more planning then we could ever imagine for such a small room.

In the end we all came together as a team and ended up with one of the most advanced operating theatres the hospital has out of the now 4 theatres they have.

Results Achieved

The completed theatre stands as one of the hospital’s most advanced clinical environments, combining safety, performance, and reliability in equal measure. The works were delivered to the highest technical and operational standards, supporting Spire Portsmouth’s commitment to exceptional patient care.