Home Safa House
Safa House
VALUE:
£2,000,000.00
TIMESCALE:
18 Months
“Safa House was transformed into a vibrant space with 14 modern flats, retail space, and eco-friendly amenities, completed on time to enhance community living.”
Client
CDO Development Ltd
Value
£2,000,000.00
Duration
18 Months
Type of Contract
JCT Design & Build
Consultant
Cetin Numanoglu
Scope of Works
Mixed-use redevelopment to provide 14 residential flats, 75sqm of use class A3 space, associated waste storage and cycle parking.
Challenges
- Retain existing façade and erect a steel frame inside.
- Carrying out the grounds works while the retaining wall was up.
- Restoring the external columns and brickwork.
Solutions
- The roof was removed carefully with a crash deck inside the property for H&s purposes, a crane was hired to position all the steels/columns and tie the PFC into the existing façade to ensure the building was safe and secure.
- We had to remove the roof to take the weight off the retaining wall, slowly removed all the steels which tied it in while ensuring the columns were in place to hold the external walls in place as we proceeded to dismantle a 13inch retaining wall while the grounds works were taking place.
- Hired a professional restoration to match the bricks and design to the façade and carried out the works. Stone masons also carved the design into the columns to match the existing.
Why This Case Study
- On-Time Completion: The project was completed on time adhering to our planned programme. Quality Standards: All 14 flats meet the highest building standards and have obtained the necessary certifications, ensuring safety and comfort for future residents. Sustainability: We utilised sustainable building materials and practices, contributing to a greener environment.
- Community Impact: The project created numerous job opportunities during the construction phase and now offers affordable, high-quality housing options to the local community.
- Impact on the Community: The successful completion of this project not only addresses the growing demand for housing in London but also enhances the local housing market. The new flats provide residents with modern amenities and energy-efficient living spaces, promoting a higher quality of life.
You may also like
VALUE: £450,000 TIMESCALE: 6-weeks “The project at Bromley Primary School involved
VALUE: £925,000 TIMESCALE: 40-weeks “The project involved the careful restoration and
VALUE: £36,082.75 TIMESCALE: 4-weeks “A delightful renovation project at Dulverton Primary