McMillan Student Village Greenwich

At McMillan Student Village in Greenwich, our team was tasked with replacing 286 consumer units within the student accommodation facilities. This large-scale electrical upgrade required precision, efficiency, and strict compliance with safety standards, all while ensuring minimal disruption to the students living on-site.

The Challenge

The project came with several unique challenges A tight programme with deadlines aligned to student changeovers. The need to work around occupied rooms, minimizing disruption to daily student life. The installation of advanced protection devices, including RCBOs and AFDDs, to meet the latest safety requirements. Completion of retesting and certification under strict time constraints.

Our Solution

To deliver the project effectively, we implemented a structured, phased approach Coordinated closely with site management to align our work with student schedules. Deployed a skilled team of electricians working to an optimized schedule to ensure all 286 units were replaced within the set timeframe. Installed RCBOs (Residual Current Breaker with Overcurrent protection) and AFDDs (Arc Fault Detection Devices), enhancing both safety and compliance with modern regulations. Conducted thorough retesting and inspections, ensuring all units were certified and signed off before student reoccupation.

Results Achieved

Successful replacement of 286 consumer units across the accommodation site.